Guides

How Much Does an HOA Reserve Study Cost?

Last updated November 1, 2026. General information, not legal or financial advice.

Most reserve study firms don't publish prices, so there's no standard number. In the public records we could reopen, full-study prices ran from $2,195 for a 215-home HOA to $19,900 for a 1,685-unit condo, and that sample is small and skews large. Size, complexity, travel and study type all change the number.
A magnifying glass held over a laptop keyboard

Most reserve study firms quote by form or by phone, which makes it hard to compare before you start a conversation. So we looked for prices in board minutes and public bid records.

What public records show

We found priced records from 11 associations, dated 2018 to 2026. That’s a small sample, and it leans toward public districts and large properties, because those groups post their records. Most of the prices below are bids or proposals, not amounts paid.

Here are full-study prices from documents we could reopen when we rechecked them:

Full-study priceWhat it wasCommunity
$2,195Losing bid, from a resident-run site215-home HOA
$6,000ProposalWater and sewer utility
$6,895 to $10,300Three bids, 20241,685-unit Virginia condo
$9,500Losing bid5,000-unit Florida district
$19,900Quote, 2025 to 2026The same Virginia condo

Board minutes from two Colorado special districts were reported to show awards of $2,590 and $3,160, but we couldn’t reopen those files, so we don’t rely on them here.

We found no priced record for a community under 50 units, so we can’t tell you what small associations usually pay.

Size alone doesn’t set the price

A 5,000-unit Florida district saw a full-study price of $9,500, while quotes for a 1,685-unit Virginia condo ran as high as $19,900.

Prices also varied for the same property. At that condo, three full-study bids in 2024 ran from $6,895 to $10,300. A fourth bid, an estimate for a different scope, was $15,000.

What about “1% of the budget”?

A long-running study firm calls it a “good rule of thumb” that a full study “is typically less than 1%” of the annual budget. That’s a ceiling, not an estimate. In the two associations where we could check, full-study prices were about 0.05% to 0.65% of budget. The top figure counts one of the Florida district’s funds, and all three funds would make it about 0.22%.

Very small communities may run above 1%, because a site visit takes time however small the budget is, though we found no small-association budget to test this. Washington’s law recognizes the problem: it exempts an association from its study rule when the cost “exceeds 10 percent of the association’s annual budget,” unless its governing documents require a study.

What makes the price go up

  • Number and type of components. A community with a clubhouse, pool and elevators takes more work than one with paving and lights.
  • Buildings the association maintains. Roofs and exteriors add time.
  • Travel. Distance to the site can add to the price. Our own travel fees are on the pricing page.
  • Speed. One firm’s FAQ lists rush fees of 20% to 50%.
  • Study type. A full study usually costs more than an update.

What updates cost

Providers describe an update as a share of a full study’s price. One says 50% to 80% with a site visit and 25% to 50% without one. These are provider claims, and we found too few records to test them.

Our prices

We publish ours. Full studies start at $2,495 for up to 15 components with no association-maintained residential buildings, up to 499 units. Other sizes, update prices and travel fees are on the pricing page.

Is the lowest bid the best bid?

Not always. In all three bid comparisons we found with a known outcome, the board did not pick the lowest price, though two of the gaps were small and one compared different scopes. A 2018 co-op survey and one resident-run site also record complaints about charges for corrections, missed deadlines and scope errors.

Before you sign, see our guide to choosing a reserve study company, or start with these:

  1. What exactly is in scope, and what’s excluded?
  2. Who visits the property, and who reviews the report?
  3. When will the report arrive, and how are dates set?
  4. Are corrections of factual errors free, and for how long?
  5. Is a board walkthrough included?
  6. Does your lender, state or governing document set requirements for who prepares it?

Sources

  1. Parkfairfax board packet, 2024 reserve study proposals
  2. Parkfairfax board packet, 2026 reserve study proposal
  3. Viera East community development district workshop packet, March 2024
  4. A study firm's FAQ on rush fees
  5. A study firm's cost guide
  6. Washington RCW 64.90.545
  7. Co-op survey on reserve studies, 2018
See what your community's study would cost.

Prices are listed by size and study type.

See pricing